05/20Define

Requirements specification

SRS · user stories · AC

Deliverables
4
Teams
6
RACI activities
5
Templates
3

Goal

Turn wishes into verifiable requirements: who does what, under which conditions, and what counts as "done".

Inputs → outputs

Inputs

  • BA document, signed SOW
  • Kick-off minutes

Deliverables

  • SRS (Software Requirements Specification)
  • Product backlog with user stories + acceptance criteria
  • Measurable NFR list (e.g. main page LCP < 2.5 s on 4G)
  • Requirements traceability matrix (RTM)

Teams & roles

  • Business Analysis (BA)writes SRS, user stories, RTM
  • Quality Assurance (QA/QC)makes acceptance criteria testable
  • Solution Architecturepins measurable NFRs
  • Application Security (AppSec)security & personal-data requirements
  • UX/UI Designconsulted on user flows
  • Client (Product Owner / sponsor)signs off SRS and acceptance criteria

RACI matrix

R — does the work · A — accountable, final sign-off (exactly one A per activity) · C — consulted before · I — informed after.

ActivityBAUXArchPMQASecOpsClient
Write use cases & user storiesAC·····C
Acceptance criteria (Given/When/Then)A···R··C
Measurable non-functional requirementsR·A··RC·
Traceability matrix (RTM)A···R···
Sign off SRS & backlogR··I···A

BA = Business Analysis (BA); UX = UX/UI Design; Arch = Solution Architecture; PM = Project Management / Scrum Master; QA = Quality Assurance (QA/QC); Sec = Application Security (AppSec); Ops = DevOps / SRE; Client = Client (Product Owner / sponsor)

Quality gate

SRS approved; every first-sprint story has acceptance criteria.

Entry criteria

  • SOW signed
  • Client-side Product Owner appointed

Exit criteria

  • SRS signed off with version number and date
  • Every first-sprint story has acceptance criteria
  • Every NFR has a target and a measurement method
  • RTM initialised
  • Spec Fidelity ≥ the agreed threshold (completeness · consistency · unambiguity · verifiability)
  • From here on, every change goes through a CR

Activities

  1. 1.Write use cases and user stories per role
  2. 2.Write acceptance criteria in Given / When / Then form
  3. 3.Pin down non-functional requirements: performance, security, availability, backup, supported devices
  4. 4.Build the role-permission matrix and the system message list
  5. 5.Build a traceability matrix: requirement → design → test

Checklist

Tick to self-review — 0/7. Ticks stay in this browser only and are not sent anywhere.

Document templates

Markdown (.md) files: open in any editor, or paste into Word / Google Docs. Each states its purpose, who fills it in and when.

Client involvement

  • Review and sign off the SRS / backlog
  • Confirm acceptance criteria — they become the basis for UAT

Tools

  • Jira / GitHub Projects / CT Work
  • Google Docs
  • Gherkin

Reference standards

ISO/IEC/IEEE 29148:2018
Requirements engineering — structure and qualities of a good SRS
ISO/IEC 25010:2023
Product quality model — a checklist for NFRs
INVEST (Bill Wake)
Good user stories: Independent, Negotiable, Valuable, Estimable, Small, Testable

Common pitfalls

  • Requirements that cannot be tested
  • Leaving NFRs to the end → architecture rework
  • SRS written once and never updated after CRs
  • Mixing requirements with UI solutions

Real example

Applied to LabFlow AI: the SRS follows the SEP490 frame (Report 3) — Context Diagram, Main Workflows, Actors & Use Cases, Functional and Non-functional Requirements, Business Rules, System Messages — and each requirement is linked to a CT Work card through the RTM.