15/20Ship

Release management

SemVer · notes · rollback

Deliverables
4
Teams
6
RACI activities
6
Templates
2

Goal

Every release has a number, contents, an approver and a way back — so you always know exactly what is running and can roll back in minutes.

Inputs → outputs

Inputs

  • UAT acceptance certificate
  • Test and security reports
  • Change list from git

Deliverables

  • Release notes + CHANGELOG
  • Tagged release with checksum / signature
  • Release approval record
  • Tested roll-back plan and commands

Teams & roles

  • DevOps / SREpackaging, tagging, roll-back
  • Project Management / Scrum Masterrelease schedule, notes, approval meeting
  • Quality Assurance (QA/QC)confirms release quality
  • Engineering (FE · BE · Mobile)feature flags, technical CHANGELOG
  • Support & Customer Successuser communication and support readiness
  • Client (Product Owner / sponsor)approves contents and timing

RACI matrix

R — does the work · A — accountable, final sign-off (exactly one A per activity) · C — consulted before · I — informed after.

ActivityPMDevQASecOpsCSClient
Version numbering & tagging·R··A··
Release notes & CHANGELOGAR···C·
Packaging & keeping the roll-back version···CA··
Feature flags & progressive enablementCA····C
Release go/no-goA·RCC·C
Roll-back rehearsal··R·A··

PM = Project Management / Scrum Master; Dev = Engineering (FE · BE · Mobile); QA = Quality Assurance (QA/QC); Sec = Application Security (AppSec); Ops = DevOps / SRE; CS = Support & Customer Success; Client = Client (Product Owner / sponsor)

Quality gate

Release approval signed; previous version kept for roll-back; release notes sent.

Entry criteria

  • Acceptance (full or milestone) signed
  • No release-blocking defects

Exit criteria

  • Version consistent across git tag, image / installer and release notes
  • Previous version kept and roll-back commands tested
  • Database migrations backward-compatible or with a restore script
  • Release approval record signed
  • Release announcement sent

Activities

  1. 1.Version with SemVer; tag git to match the build
  2. 2.Write user-facing release notes and a technical CHANGELOG
  3. 3.Package an immutable release (container image / signed installer), keep the previous one for roll-back
  4. 4.Put new features behind feature flags to separate "deploy" from "release"
  5. 5.Release go/no-go: testing, security, acceptance, migrations, roll-back plan
  6. 6.Rehearse roll-back and define when it is mandatory

Checklist

Tick to self-review — 0/6. Ticks stay in this browser only and are not sent anywhere.

Document templates

Markdown (.md) files: open in any editor, or paste into Word / Google Docs. Each states its purpose, who fills it in and when.

Client involvement

  • Approve release contents and timing
  • Notify end users

Tools

  • Git tag / GitHub Releases
  • Container registry (GHCR)
  • Feature flag (OpenFeature)
  • CHANGELOG.md

Reference standards

Semantic Versioning 2.0.0
MAJOR.MINOR.PATCH — bump MAJOR on breaking changes
Keep a Changelog 1.1.0
Human-readable changelog convention
ITIL® 4 — Release management · Deployment management
Two distinct practices: releasing value to users and moving changes into environments
OpenFeature (CNCF)
Open, vendor-neutral specification for feature-flag APIs
DORA metrics
Change failure rate and time to restore

Common pitfalls

  • Bumping the version by hand and never releasing it
  • Two builds overwriting the same version number
  • Irreversible migrations without a plan
  • Feature flags left forever as technical debt

Real example

cuongthai.com (desktop app), 19–20 Aug 2026: one version number was bumped but never released, and another was built twice, the second overwriting the first. Releases now go through ONE command: check the branch, require a clean tree, block while another build runs, refuse already-published versions, and re-check the auto-update files after the build.